A claims processing workflow is a chain of steps: opening the claim, gathering documentation, writing a narrative summary, routing by type and complexity, and then resolving or escalating the claim.

  • Programming

A Goal Stated as an Outcome

Imagine an organization that asks for help with a clear goal: make a process faster. The request sounds specific, so the natural first move is to start working on the thing it names. This article follows a real engagement to show why that instinct can send effort in the wrong direction. The organization was a regional property and casualty insurer, meaning an insurance company that covers property and liability risks across its regions. It had roughly three thousand claims processors working across two operating regions.

The insurer's kickoff request was phrased as a plan to use AI to reduce claims processing time. The senior vice president of claims operations, who sponsored the work, had made a fifteen-percent reduction in average claim cycle time one of the top five priorities for the year. The question this article asks is simple: when a goal is stated as the time a whole process takes, how do you find the part of the process that is responsible for that time?

What do you think happens?

Before reading on, which step of a claims workflow do you think consumed the most time per claim?

  • Opening the claim

  • Gathering initial documentation

  • Writing the narrative summary

  • Routing the claim by type and complexity

  • Resolving or escalating the claim

Reveal answer
Answer:

Writing the narrative summary, which took roughly twenty-five minutes per claim.

The guess is worth making because a step's name or position in the workflow says little about how long it takes. Only measurement shows where the time goes.

Tracing a Claim Through Its Steps

To make sense of any bottleneck, you first need a clear picture of the workflow itself. In the insurer's case, discovery interviews surfaced the following sequence. A claims processor opens a claim. The processor then gathers initial documentation. Next, the processor summarizes the claim in narrative form for the file. After that, the claim is routed based on its type and complexity. Finally, the claim is either resolved directly by the processor or escalated to a senior handler.

Open claimGather documentationNarrative summaryRoute by type andcomplexityResolve or escalatehands off documentationhands off file detailshands off summaryhands off routed claim
What is the order of steps a claim passes through, from opening to resolution or escalation, and what does each step hand off to the next?

Notice that the workflow is a chain. Each step hands work to the next, so the total time a claim takes is the sum of the time spent at each stage, plus any waiting between them. The routing decision depends on what the narrative summary contains, which means the summary is not an optional extra. It is part of the path every claim must travel. A slow step anywhere in a chain slows every claim that passes through it.

Following the Clock at Each Step

A bottleneck is the step that limits overall performance, and it is found by measuring how long each step takes rather than by assuming where the problem lies. The insurer's interviews did not identify the bottleneck by asking which step felt slow. They identified it by looking at how long each step actually took. The narrative summary took roughly twenty-five minutes per claim, and this measurement was the evidence that separated a hunch about a bottleneck from a finding about one.

Open claimGather documentationNarrative summaryabout 25 minutes per claimRoute by type andcomplexityResolve or escalatethenthenthenthen
Which step consumes the most elapsed time for a claim, and how does that compare to where the team believed the delay was?
Worked example

Turning a per-claim duration into a daily share

A claims processor produces fifteen to twenty claims a shift, and the narrative summary takes roughly twenty-five minutes per claim. How much of the shift does summary writing consume, and what does that imply?

  1. 1
    Find the minutes spent on summaries at the low end

    Fifteen claims at about twenty-five minutes each is about 375 minutes of summary writing.

  2. 2
    Find the minutes spent on summaries at the high end

    Twenty claims at about twenty-five minutes each is about 500 minutes of summary writing.

  3. 3
    Compare against the working day

    The source's conclusion is that more than half of the working day was spent writing narrative summaries. The arithmetic above is the kind of calculation that makes that conclusion checkable.

Result

Summary writing is the largest single consumer of processor time, which is why it is the step to investigate first.

The Stated Problem Versus the Real Problem

Definition

The stated problem is the problem as it was first described in a request. The real problem is the step or condition that actually limits the outcome. In the insurer's case, the stated problem was claims processing time, which describes an outcome. The real problem was narrative writing at roughly twenty-five minutes per claim.

Two assumptions cause trouble here. The first is that the slow part is whatever the description points at. The second is that every stage of the process contributes roughly equally to the total. Neither is safe. A description of an outcome tells you where the outcome shows up, not which step is producing it. A request to reduce processing time points at the whole claim, but the whole claim is only as fast as its slowest dependent step allows.

Claims processingtimeNarrative summarywritingAn outcome across thewhole claimA single step atabout 25 minutes perclaim
How does the problem people first named differ from the step where work actually stalls, and what does each one point to?

This matters before any solution is chosen. The source notes that the stated problem and the real problem had different first slices. The first concrete piece of work suggested by the request would not have addressed the step that mattered most. If the team had started from the wording of the request, its effort would have gone toward the wrong place.

How Problem Scoping Surfaces the Real Problem

Problem scoping is the process of understanding and defining a problem before committing to a solution. It includes discovery interviews across roles, which is how the real problem is identified. In the insurer's engagement, scoping took the first two weeks. The field-deployed engineer spent four days on-site at the larger of the two regional operations centers and conducted eight discovery interviews.

  • Three interviews were with line claims processors, who saw the daily work of producing summaries.
  • Two interviews were with senior claims handlers, who saw what arrived at the escalation end of the chain.
  • The remaining three were with the head of compliance, a privacy officer, and the sponsor, who each saw the workflow from a different angle.

Each group saw the workflow from a different angle, and the interviews together revealed the narrative summary as the step that consumed the most time. No single interview would have been enough on its own. The value of scoping is that it brings several views of the same chain together, so that a bottleneck can be checked against more than one source of evidence.

Best practice

Before choosing a solution, write the workflow as an ordered chain of steps, record how long each step takes, and confirm the slowest step with people from more than one role. Only then decide what the first piece of work should be.

Mistakes When Hunting for a Bottleneck

  • Common mistake

    Treating the stated problem as the real problem

    What it looks like

    A request asks to reduce processing time, so the team starts on whichever step the request seems to name.

    Why it fails

    A description of an outcome shows where the outcome appears, not which step produces it.

    Do this instead

    Start from the workflow and the measured time at each step, then match the stated goal to the step that dominates.

  • Common mistake

    Assuming every step contributes equally

    What it looks like

    The team assumes opening, documenting, summarizing, routing, and resolving each take a similar share of time.

    Why it fails

    In a chain, the time spent at each stage can differ sharply, and one stage can dominate the total.

    Do this instead

    Measure how long each step actually takes before drawing conclusions about the total.

  • Common mistake

    Relying on the feeling of slowness

    What it looks like

    A manager says the approval stage feels slow, so approval is named the bottleneck.

    Why it fails

    Feelings reflect where people notice waiting, which is not always where the most time is spent.

    Do this instead

    Use time data for each step as the evidence, and treat impressions as hypotheses to test.

  • Common mistake

    Interviewing only one role

Edge case

A step can look unimportant in a workflow diagram and still be the bottleneck. The narrative summary sits in the middle of the chain and is not the most visible stage, yet it consumed the most time. Position in the diagram is not a measure of duration.

Checking a Workflow Against Its Timing

MEDIUM

Suppose a team says its claims process is slow because approvals take too long. Its time log shows that writing a narrative summary takes about 25 minutes per claim, while the team's own estimate for approvals is much smaller. Which step is the likely bottleneck, what would you measure before choosing a fix, and what should the first piece of work address?

Hints
  • Ask which step the time log says consumes the most time, not which step the team believes is slow.
  • Consider whether the stated problem, the process as a whole being slow, is an outcome that could come from more than one step.
  • Think about whether scoping should include people from more than one role before committing to a fix.

Key Takeaways

  • A claims workflow is a chain of steps: opening the claim, gathering documentation, writing a narrative summary, routing by type and complexity, and resolving or escalating. Total time is the sum of time at each stage plus waiting between them.
  • A bottleneck is the step that limits overall performance. It is found by measuring how long each step takes, not by assuming where the problem lies or which step feels slow.
  • A stated problem often describes an outcome, such as processing time, and can differ from the real problem. In the insurer's case, the real problem was narrative writing at roughly twenty-five minutes per claim.
  • Problem scoping, including discovery interviews across roles, is how the real problem is identified. It should happen before any solution is chosen, so effort is not spent on the first slice the request suggests.